Thursday, August 30, 2007
installation scheduled
I've not made a great deal of progress on the drawing but I have scheduled its installation for Friday, September 21st - about three weeks away. Ty Art, an art services company from town is going to handle the delivery and installation of the drawings. It's going to be a fairly labor-intensive process: I'll first have to roll the canvasses on 10"-12" diameter, 10' long tubes, then Ty Art will pick up and deliver them and the un-assembled stretcher bars to UH. Since the drawings will be installed at app. 18' off the ground, it will require scaffolding and ladders. Ty Art will stretch the canvasses in the commons area, then install them. As Christopher Tribble, co-founder of Ty Art, told me, it's doubtful a sheetrock wall will be perfectly flat across 13'(let alone 26'!). So I'm sure there will be some issues to work around. We're anticipating it will take a full day. First though, I need to finish the drawing. I hope to make some headway this weekend.
Monday, August 13, 2007
right panel taped and trimmed
This weekend I finished taping and trimming the end of the banner which appears on the right panel. Now comes some experimentation with charcoal dust on a separate, smaller canvas. A note: the panels, when installed, will be closer together. The banner on the right panel was positioned with that distance in mind.
Friday, August 10, 2007
taped and trimmed
Tuesday, August 7, 2007
progress
I've drawn the banner on the left panel and begun taping it off with masking tape. Next I'll trim the tape to the contour of the banner with an Exacto knife.
Subscribe to:
Posts (Atom)